Pump Sizing: Flow Rate, TDH and NPSH Calculations

1. Which standard applies?
| Region | Reference | Typical use |
|---|---|---|
| American | ANSI/HI 9.6.1 (NPSH margins), ANSI/HI 14.6 (tests), API 610 | US units (gpm, ft, psi) |
| British | BS EN ISO 9906, BS EN 806, CIBSE Guide C | SI (m³/h, m, kPa) |
| European | EN ISO 9906, EN ISO 5199, EN 733 | SI |
The physics is identical; the standards differ in units, test grades and recommended margins.
2. Flow rate (Q)
Establish the design flow from demand, then add a margin (typically 5–10%) and keep pipe velocity within 1–3 m/s (3–10 ft/s).
3. Total Dynamic Head (TDH)
Friction loss – Darcy–Weisbach (ISO/European/British practice; also accepted in the US):
Hazen–Williams (common in US water/fire systems, SI form):
Minor losses:

4. NPSH available and required
Acceptance criterion:
5. Power
6. Try it: interactive calculator (SI)
7. Worked example (SI)
Clean water at 20 °C (ρ = 998 kg/m³, Pv = 2.34 kPa), Q = 50 m³/h, 100 mm pipe, 120 m long, ε = 0.045 mm, ΣK = 6, flooded suction. These are the calculator's default values, so you can reproduce every line below above.
| Item | Value |
|---|---|
| Static head Hs | 18.0 m |
| Friction loss (v = 1.77 m/s, Re ≈ 176,000, f = 0.0189) | 3.61 m |
| Minor losses (ΣK = 6) | 0.96 m |
| TDH (≈ 74 ft) | 22.6 m |
| NPSHa = 10.11 + 2.0 − 0.8 | 11.3 m |
| NPSHr (datasheet) ×1.3 | 3.5 × 1.3 = 4.55 m → OK |
| Shaft power at η = 70% | ≈ 4.4 kW (select next motor size, e.g. 5.5 kW). Flow ≈ 220 gpm. |
8. Common mistakes
- Using gauge instead of absolute pressure for NPSHa.
- Ignoring viscosity, temperature or altitude corrections.
- Selecting far from the best efficiency point (aim for 70–120% of BEP flow).
- Skipping the NPSH margin on hot or hydrocarbon services.